Friday 18 January 2019
EN FA AR
  • Home
  • Projects
  • Iran
  • Omidieh Crude Oil Scheme
Omidieh Crude Oil Scheme

Omidieh Crude Oil Scheme

Client
Petroleum Engineering and Development Company

Period :
2010 Nov - 2013 Nov

Location :
Iran

Type of Project :
PC


In July 2010 OMRAB conclusion a contract for procurement, construction of Omidieh Crude Oil (concrete storage tanks). This project now is under construction and total period of contract is 3 years.

Scope of woks includes Procurement, Installation Operating & Commissioning of Mechanical, Electrical, Control and Instrument equipment & Construction of 2*500,000 bbl concrete storage tank

The Treatment Process: Process pumps, Fire fighting pumps oily water pumps, Foam pumps, Safety, Nitrogen supply, System, Mixer, Air assisted flare, Oily water, Separation system, Striper, Power transformer,LV8MV system, Emergency Diesel Generator,Telecomm system, Catholics protection and construction 2*500,000 bbl concrete storage tank.

Latest News

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

Awarding highest score to Abadan refinery cooling water system

During the international imposed limitations and embargos, Iranian engineers in Omrab Company presented their state of art design, which has brought a great honor to Iran and

Khartoum Logistics center

Supplying machinery for mobilization of Sudan water treatment plant projects