Client
                            Khorasan Regional water Company
                        
                        Period :   
                            
                            2004 Jul - 2006 Jul
                        Location :   
                            
                            Khorasan, Iran
                        Type of Project :   
C
                    
                 
             
             
         
        
        
        
            Contract Subject: Construction of 58 Km Transmission Pipeline with 2000 mm diameter, 3 Water tanks, Valve chambers, Pump stations along with auxiliary buildings
 Scope of Works:
In July 2004 OMRAB was awarded a contract for Construction of Water Transmission Pipeline of Doosti Dam to Mashhad City.
 This project accomplished during 2 years.
Scope of woks includes  about 60 km Water Transmission Pipeline (DN 2000), 150 unit Valve chamber, 3 Storage tank with Capacity of 15,000 m3, 1 storage tank with Capacity of 10,000 m3 per day,3 chlorination buildings, 3 pump stations, landscaping about 6 acres  and a tunnel with length 900m and 6.7 m Diameter.