Wednesday 26 June 2019
EN FA AR

News

  • Home
  • Press
  • News
  • Chitgar Pond Water Treatment Plant

Chitgar Pond Water Treatment Plant

 Chitgar Pond Water Treatment Plant
Date:8/8/2013 / Visit Count : 160
Contract Awarding ...

Contract Name: CHITGAR POND WATER TREATMENT PLANT
Contract Type: Design, Build & Operation (DBO)
Designer: APP Consulting Engineers (Omrab's sister company)
Client: Tehran Municipality
Consultant: Toossab Consulting Engineers Company
PMC: Armature Pardis Engineering and Construction Company
Contractor: Omrab Eng. Co. General Contractor

Plant Capacity: 400 l/s supplied from Kan River
Influent Quality:
• TP: 400 mg/l
• TSS: 150 mg/l
• Turbidity: 40 NTU
Effluent Quality:
• TP: 60 mg/l
• TSS: 10 mg/l
• Turbidity: 4 NTU
Treatment process:
• Screening (Fine & Micro screening);
• Combined coagulation, Flocculation, Clarification and Thickening Unit (LHPS);
• Dual Media Filtration;
• Sodium Hypochlorite Disinfection;
• Mechanical Dewatering

With Special Thanks, Mr.Mohebi From APP Consulting Enginers Co.
ViVa




Latest News

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

Awarding highest score to Abadan refinery cooling water system

During the international imposed limitations and embargos, Iranian engineers in Omrab Company presented their state of art design, which has brought a great honor to Iran and

Khartoum Logistics center

Supplying machinery for mobilization of Sudan water treatment plant projects