Ghouchan Water Treatment Plant Project

Scope of woks includes Engineering, Procurement, Installation and Erection of Mechanical, Electrical and Instrumentation Equipment. Conventional Treatment consists of: Flash mixing unit, Flocculation and Sedimentation (Pulsator unit), Gravity Sand filter, Gas Chlorination System and Control System with total capacity of 54,432 m3 per day.

2004 May-2006 May(Iran)

Sanandaj Waste Water Project

Scope of works includes Procurement, Installation and Construction of Sludge Part of waste water Treatment Plant. Anaerobic Sludge Digestion, Sludge Gravity Thickening unit, Sludge dewatering unit (Belt filter Press and drying bed), UV disinfection unit, Gas holder unit with total capacity of 216,000 m3 per day

2004 May-2006 Nov(Iran)

Tabriz Power Plant Demineralization Scheme

In March 2003 OMRAB conclusion a contract for engineering, procurement and construction of Tabriz Power Plant demineralization Scheme. This project accomplished during 2 years. Scope of woks ...

2003 Nov-2004 Nov(Iran)

Rehabilitation of Shiraz Water Supply Scheme

In November 2003 OMRAB conclusion a contract for procurement and construction of Rehabilitation of Shiraz city Water Supply Scheme. This project accomplished during 3 years. Scope of woks inclu ...

2003 Nov-2006 Nov( Iran)

Meymeh Pump Station Project

Scope of woks includes Procurement, Installation and Furnishing Pump station by 4 Split Case Pumps with total Capacity of 129,600 m3/day and Surge Protection System. In this project most of hydro electromechanical equipment supplied from Iran and west of Europe well known partners and suppliers such as K.S.B, Siemens and Endress+Hauser (Germany).

2003 Jun-2005 Jun(Iran)

Persian Gulf Coastal Cities Water Supply project

In June 2002 OMRAB conclusion a contract for procurement and construction of Persian Gulf Coastal Cities Water treatment plant consist of main plant and extension. This project accomplished during 3 y ...

2002 Nov-2005 Nov(Iran)

Sirjan Water Supply Scheme

In March 2002 OMRAB conclusion a contract for engineering, procurement, construction of Sirjan city Water treatment plant. This project accomplished during 4 years. Scope of woks includes Procu ...

2001 Nov-2005 Nov(Iran)

Bandar Abbas Water Supply Scheme

In October 2001 OMRAB conclusion a contract for engineering, procurement, construction of Bandar Abbas city water taste and odor removal. This project accomplished during 3 years. Scope of woks ...

2001 Nov-2004 Nov(Iran)

Pars 1 Pump Station Project

Scope of works includes Procurement, Installation, Commissioning and Construction of civil works and 3km water transmission Pipeline (DN: 1400 mm). This Pump station was furnished by 14 multistage high Pressure Pumps with total capacity of 19'000 m3 per day.

2001 May-2002 May(East Azerbaijan, Iran)

Karvan Pump Station Project

Scope of works includes Construction, Installation and Furnishing Pump station by 3 Split case Centrifugal pumps, surge Protection System, Control System, Transformation if Power Supply system. With total capacity of 34'560 m3 per day.

2001 Mar-2003 Apr(Isfahan, Iran)
Latest News

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

World's Leading Trade Fair for Water, Sewage, Waste and Raw Materials Management

Awarding highest score to Abadan refinery cooling water system

During the international imposed limitations and embargos, Iranian engineers in Omrab Company presented their state of art design, which has brought a great honor to Iran and

Khartoum Logistics center

Supplying machinery for mobilization of Sudan water treatment plant projects