Iran - Armenia Gas Station Project

Contract Subject: Iran-Armenia border Transmission Pipe Gas Metering Station Project Scope of Works: In July 2006 OMRAB as a member of JV was awarded a contract for Engineering, Procurement and Construction of Iran-Armenia Border Gas Metering Station. This project accomplished during 1 year. Scope of woks includes metering and analyzing system Including Filtration unit, Metering System, Control system, Power Generator unit, UPS unit and PIC unit

2006 Jul-2007 Jul( Iran)

Roudbar Lorestan Dam Scheme

In October 2004 OMRAB conclusion a contract for procurement and construction of power station for mobilization of Roudbar Lorestan Dam. This project accomplished during 2 years. Scope of woks inclu ...

2004 Nov-2006 Nov(Iran)

Kermanshah Petrochemical Water Supply Project

Scope of woks includes Design, Supply, Installation and Furnishing Pump station by 6 Vertical turbine Pumps, Surge Protection System, with total Capacity of 16,800 m3 per day and 5.5 kilometer pipeline transmission for water supplying of Kermanshah petrochemical Industry, 2 electrical substation, all civil works including 2 Reservoirs each capacity of 20,000 m3.

2004 Jul-2006 Jul(Iran)

Doosti Dam Transmission Pipeline Project

Scope of woks includes about 60 km Water Transmission Pipeline (DN 2000), 150 unit Valve chamber, 3 Storage tank with Capacity of 15,000 m3, 1 storage tank with Capacity of 10,000 m3 per day,3 chlorination buildings, 3 pump stations, landscaping about 6 acres and a tunnel with length 900m and 6.7 m Diameter.

2004 Jul-2006 Jul(Khorasan, Iran)

Ghouchan Water Treatment Plant Project

Scope of woks includes Engineering, Procurement, Installation and Erection of Mechanical, Electrical and Instrumentation Equipment. Conventional Treatment consists of: Flash mixing unit, Flocculation and Sedimentation (Pulsator unit), Gravity Sand filter, Gas Chlorination System and Control System with total capacity of 54,432 m3 per day.

2004 May-2006 May(Iran)

Sanandaj Waste Water Project

Scope of works includes Procurement, Installation and Construction of Sludge Part of waste water Treatment Plant. Anaerobic Sludge Digestion, Sludge Gravity Thickening unit, Sludge dewatering unit (Belt filter Press and drying bed), UV disinfection unit, Gas holder unit with total capacity of 216,000 m3 per day

2004 May-2006 Nov(Iran)

Tabriz Power Plant Demineralization Scheme

In March 2003 OMRAB conclusion a contract for engineering, procurement and construction of Tabriz Power Plant demineralization Scheme. This project accomplished during 2 years. Scope of woks ...

2003 Nov-2004 Nov(Iran)

Rehabilitation of Shiraz Water Supply Scheme

In November 2003 OMRAB conclusion a contract for procurement and construction of Rehabilitation of Shiraz city Water Supply Scheme. This project accomplished during 3 years. Scope of woks inclu ...

2003 Nov-2006 Nov( Iran)

Meymeh Pump Station Project

Scope of woks includes Procurement, Installation and Furnishing Pump station by 4 Split Case Pumps with total Capacity of 129,600 m3/day and Surge Protection System. In this project most of hydro electromechanical equipment supplied from Iran and west of Europe well known partners and suppliers such as K.S.B, Siemens and Endress+Hauser (Germany).

2003 Jun-2005 Jun(Iran)

Persian Gulf Coastal Cities Water Supply project

In June 2002 OMRAB conclusion a contract for procurement and construction of Persian Gulf Coastal Cities Water treatment plant consist of main plant and extension. This project accomplished during 3 y ...

2002 Nov-2005 Nov(Iran)
Latest News

Signing the Contract with "Jahan Foulad Sirjan" company to suppl "RO water purification" system

supplying the purified water needed in its factories, including smelting and casting plant No. 1 of Jahan Foulad Sirjan factories

Signing the Contract with "Pars Oil and Gas" Company to "provide conceptual and basic design engineering services

In March 1401 Omrab.Co signed a contract to provide conceptual and basic design engineering services for Improvement and upgrade of wastewater treatment units in South Pars gas power plants

implementing industrial water treatment plant and cooling tower systems of Shadegan Steel Complex

Since July 1401, Omrab Engineering Company has signed a contract for engineering, equipment supply, installation and operation of industrial water treatment plant and cooling tower systems with this steel complex